Provision of Tubing Pack-Off equipment and Spare Parts to Isolate assemblies to eliminate Leakages in the Tubings and deepening the Gaslift injection point the Wells of block 09-1 (ITB VT-1024/24-KT(HC))(email:dungpv.hq@vietsov.com.vn; Ext.2415) | ChamThau.com